Fleet
Equipment and fleet
Owned equipment, sized for decommissioning scope. Operational status, maintenance schedule and equipment-by-equipment competency assignment are documented and available on request.
Unit by unit
Every unit, tied to the procedure that governs it
Vibraram XS3000 hydraulic shear
Mounted on a Case CX240 24-tonne hydraulic excavator. On-lease cutting of surface vessels, piping, tubing and rods to transportable size.
SJP-01 · Mobile ShearingLiebherr 944 C HD material handler
High-disposal configuration with grapple and magnet attachments. Yard processing and load-out.
SJP-02 · Excavator & Material Handler25-tonne hydraulic excavators
Thumb attachments. Site handling, sorting and support to the shear.
SJP-02 · Excavator & Material HandlerKenworth tri-drive Class 8 tractors

Heavy haul to mill and between sites.
SJP-04 · Journey Management JM-01Volvo tandem roll-off trucks

Bin placement and recovery on customer sites.
SJP-04 · Roll-Off Bin Loading & Load Securement53-ft open-top gondola trailers
22 to 26 tonnes per load, on prepared-and-structural, shred and non-ferrous streams.
SJP-04 · Load SecurementRoll-off bins
Sustained customer-site placement across concurrent programs.
SJP-04 · Roll-Off Bin LoadingAn equipment list with operational status, maintenance schedule and competency assignment is part of the capability package.
Next step